---
title: UK construction contractors media reputation tracker – July 2026
canonical_url: https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07
type: dataset
publisher: Omniscan
sector: UK Construction Contractors
period: July 2026
coverage_start: '2026-07-01'
coverage_end: '2026-07-31'
date_published: '2026-09-01'
last_updated: '2026-09-01'
organisations: 10
articles_analysed: 1019
mentions: 447
data_download: https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/data.json
summary: Kier Group had the highest average monthly share of coverage (20.1%) among
  10 contractors in UK earned media from 1 July 2026 to 31 July 2026, ahead of Morgan
  Sindall (15.0%) and Balfour Beatty (13.4%).
---

# UK construction contractors media reputation tracker: July 2026 (1 July 2026–31 July 2026)

> Kier Group had the highest average monthly share of coverage (20.1%) among 10 contractors in UK earned media from 1 July 2026 to 31 July 2026, ahead of Morgan Sindall (15.0%) and Balfour Beatty (13.4%). Galliford Try had the most favourable net tone (+88). Omniscan analysed 1,019 articles containing 447 mentions of the contractors tracked.

Interactive version: https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07

## UK Construction Contractors ranking by share of coverage, July 2026

| Rank | Organisation | Average monthly share of coverage | Mentions | Positive | Neutral | Negative | Net tone |
| --- | --- | --- | --- | --- | --- | --- | --- |
| 1 | Kier Group | 20.1% | 90 | 75% | 23% | 2% | +72 |
| 2 | Morgan Sindall | 15.0% | 67 | 90% | 7% | 3% | +87 |
| 3 | Balfour Beatty | 13.4% | 60 | 68% | 24% | 8% | +60 |
| 4 | Galliford Try | 11.2% | 50 | 90% | 8% | 2% | +88 |
| 5 | Laing O'Rourke | 8.9% | 40 | 75% | 23% | 2% | +73 |
| 6 | Skanska UK | 7.2% | 32 | 47% | 34% | 19% | +28 |
| 7 | Mace | 6.9% | 31 | 39% | 58% | 3% | +35 |
| 8 | Costain | 6.5% | 29 | 55% | 41% | 4% | +52 |
| 9 | Wates | 5.6% | 25 | 76% | 20% | 4% | +72 |
| 10 | Sir Robert McAlpine | 5.1% | 23 | 52% | 31% | 17% | +35 |

## Contractors in detail

### Kier Group

**Kier regained the lead as contracts broadened its media profile**

Kier Group ranked 1st of 10 by average monthly share of coverage (20.1%) in the UK Construction Contractors benchmark for July 2026, with 90 mentions and a net tone of +72.

July restored Kier to first place with 90 mentions and a 20.1% share, as trading coverage and contract awards converged around an order book approaching £12bn, Birmingham highways and new water, school and property work. July 2026: volume increased by 30 to 90 and share rose 1.6 points to 20.1%, taking Kier from second to first; contemporaneous developments included the £120m Birmingham highways extension and trading expectations at the top end of the market range. Kier expects FY26 results to be at the top end of market expectations after strong second-half momentum. Its order book rose to about £11.9bn, with infrastructure and construction securing substantial new business. A UK market report noted that Kier Group shares rose after the contractor said full-year profit and revenue should reach the top end of market expectations. The article also covered wider economic data and other listed companies.

Key messages:

- Kier expects FY26 results to be at the top end of market expectations after strong second-half momentum. Its order book rose to about £11.9bn, with infrastructure and construction securing substantial new business.
- A UK market report noted that Kier Group shares rose after the contractor said full-year profit and revenue should reach the top end of market expectations. The article also covered wider economic data and other listed companies.
- Kier Group has been appointed to build a replacement Hinchingbrooke Hospital after RAAC was identified in the existing facility. The project is part of the first wave of the New Hospital Programme and is expected to open by the end of 2032.
- The Company Names Tribunal ordered Kier Bam JV Ltd to change its name after a complaint from Kier and Bam businesses. The respondent did not defend the application.
- Kier secured contracts worth a combined £98m for the Wellfield Academy and Anglo European School redevelopments. Both projects include low-carbon or net-zero operational design features.

Leading themes:

- Contract Awards & Order Books: 26.7% of Kier Group's coverage (theme index 1.19, net tone +96)
- Major Projects & Delivery: 22.2% of Kier Group's coverage (theme index 1.09, net tone +60)
- Policy, Procurement & Infrastructure Pipeline: 21.1% of Kier Group's coverage (theme index 1.08, net tone +37)

Notable positive coverage:

- 21 July 2026, sharecast.com: [Kier sees FY results at top end of expectations](https://www.sharecast.com/news/news-and-announcements/kier-sees-fy-results-at-top-end-of-expectations--23081324.html). Kier expects FY26 results to be at the top end of market expectations after strong second-half momentum. Its order book rose to about £11.9bn, with infrastructure and construction securing substantial new business.
- 21 July 2026, sharecast.com: [London open: Stocks edge lower as investors mull jobs, borrowing data](https://www.sharecast.com/news/market-report-opening/london-open-stocks-edge-lower-as-investors-mull-jobs-borrowing-data--23080512.html). A UK market report noted that Kier Group shares rose after the contractor said full-year profit and revenue should reach the top end of market expectations. The article also covered wider economic data and other listed companies.
- 30 July 2026, bbc.co.uk: [Hinchingbrooke Hospital appoints construction partner for rebuild](https://www.bbc.co.uk/news/articles/c8xnv927j5qo). Kier Group has been appointed to build a replacement Hinchingbrooke Hospital after RAAC was identified in the existing facility. The project is part of the first wave of the New Hospital Programme and is expected to open by the end of 2032.

Notable negative coverage:

- 8 July 2026, independent.co.uk: [Describing someone as 'coloured' isn't necessarily racist, judge rules](https://www.independent.co.uk/news/uk/home-news/employment-tribunal-coloured-amy-reeves-b3011276.html). An employment tribunal dismissed a former Kier employee's claims of racial harassment, discrimination and victimisation relating to workplace comments. The judgment found a colleague used a racially slanted term but did not intend to offend, and that it was not reasonable for the comment to have the prohibited effect.
- 8 July 2026, lse.co.uk: [Reflect & Prepare (By Rajan Dhall). Read Reflect & Prepare's Blog - London South East.](https://www.lse.co.uk/blogs/expert/reflect-and-prepare-by-rajan-dhall.html). A markets roundup reports that Kier Group posted a £35m loss despite a 3% increase in revenue to £2bn. It also notes the cost of the company's cost-cutting programme.

- [Kier Group deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=kiergroup&view=deep-dive)
- [Kier Group PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/kiergroup.pdf)

### Morgan Sindall

**Morgan Sindall’s results and projects underpin third-place profile**

Morgan Sindall ranked 2nd of 10 by average monthly share of coverage (15.0%) in the UK Construction Contractors benchmark for July 2026, with 67 mentions and a net tone of +87.

July’s share increased to 15.0% and the company moved to second as record first-half results, higher medium-term targets and approval for the Crystal Palace overhaul featured prominently. July 2026: Morgan Sindall signed the contract to build Milton Keynes University Hospital under the Hospital 2.0 programme, reported by the BBC. Morgan Sindall reported record first-half results, with revenue of £2.5bn and pre-tax profit of £116m. Construction and fit-out performance strengthened, while Muse recorded a loss amid challenging market conditions. Morgan Sindall posted record first-half results, including 21% growth in adjusted pre-tax profit and an increased interim dividend. It lifted medium-term targets for its Fit Out and Construction businesses while maintaining a £12.2bn secured order book. Morgan Sindall has completed replacement of the roof and structural stabilisation work at Haverfordwest Castle as part of its £18m redevelopment. The project reports carbon savings, material reuse and local apprenticeship benefits ahead of a planned 2028 reopening.

Key messages:

- Morgan Sindall reported record first-half results, with revenue of £2.5bn and pre-tax profit of £116m. Construction and fit-out performance strengthened, while Muse recorded a loss amid challenging market conditions.
- Morgan Sindall posted record first-half results, including 21% growth in adjusted pre-tax profit and an increased interim dividend. It lifted medium-term targets for its Fit Out and Construction businesses while maintaining a £12.2bn secured order book.
- Morgan Sindall Construction has signed a contract to build a new hospital at Milton Keynes University Hospital under the Hospital 2.0 programme. Construction could begin in 2027, with opening anticipated by 2030.
- Morgan Sindall has completed replacement of the roof and structural stabilisation work at Haverfordwest Castle as part of its £18m redevelopment. The project reports carbon savings, material reuse and local apprenticeship benefits ahead of a planned 2028 reopening.
- Lovell Partnerships has won a £53m contract to rebuild the Meadow Grange affordable-housing scheme in Southend after Ilke Homes' defective modular development was demolished. The replacement scheme comprises 221 homes and is due to complete in November 2028.

Leading themes:

- Major Projects & Delivery: 34.3% of Morgan Sindall's coverage (theme index 1.86, net tone +74)
- Financial Results & Trading: 34.3% of Morgan Sindall's coverage (theme index 2.61, net tone +96)
- Contract Awards & Order Books: 14.9% of Morgan Sindall's coverage (theme index 0.6, net tone +100)

Notable positive coverage:

- 23 July 2026, placemidlands.co.uk: [Morgan Sindall on course to exceed £5bn revenue again](https://www.placemidlands.co.uk/morgan-sindall-on-course-to-exceed-5bn-revenue-again/). Morgan Sindall reported record first-half results, with revenue of £2.5bn and pre-tax profit of £116m. Construction and fit-out performance strengthened, while Muse recorded a loss amid challenging market conditions.
- 23 July 2026, sharecast.com: [Morgan Sindall hails record H1, lifts medium-term targets for two units](https://www.sharecast.com/news/news-and-announcements/morgan-sindall-hails-record-h1-lifts-medium-term-targets-for-two-units--23107229.html). Morgan Sindall posted record first-half results, including 21% growth in adjusted pre-tax profit and an increased interim dividend. It lifted medium-term targets for its Fit Out and Construction businesses while maintaining a £12.2bn secured order book.
- 30 July 2026, bbc.co.uk: [Company signs contract to build new Milton Keynes Hospital](https://www.bbc.co.uk/news/articles/c80np9glnr7o). Morgan Sindall Construction has signed a contract to build a new hospital at Milton Keynes University Hospital under the Hospital 2.0 programme. Construction could begin in 2027, with opening anticipated by 2030.

Notable negative coverage:

- 30 July 2026, constructionnews.co.uk: [Council that ‘sacked’ Morgan Sindall immediately reinstates firm for £1m extra](https://www.constructionnews.co.uk/contractors/morgan-sindall/council-that-sacked-morgan-sindall-immediately-reinstates-firm-for-1m-extra-30-07-2026/). Basildon Council extended Morgan Sindall Property Services’ housing-repairs contract by one year at an additional £1m after abandoning plans to bring the service in-house. The article cites previous criticism of the contractor’s repair and maintenance performance.
- 4 July 2026, walesonline.co.uk: [They moved to a brand new £24m housing estate. Now they're desperate to leave](https://www.walesonline.co.uk/news/wales-news/moved-brand-new-24m-housing-34222199). Residents at a new Cardiff social-housing development report overheating, appliance failures, flooding and other defects. Lovell Partnerships is working with housing association Hafod to address the concerns.

- [Morgan Sindall deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=morgansindall&view=deep-dive)
- [Morgan Sindall PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/morgansindall.pdf)

### Balfour Beatty

**Balfour Beatty leads despite sharp monthly swings**

Balfour Beatty ranked 3rd of 10 by average monthly share of coverage (13.4%) in the UK Construction Contractors benchmark for July 2026, with 60 mentions and a net tone of +60.

July brought a fall to 13.4% and third place even as Balfour Beatty secured the Leeds ring-road programme and invested £10m in Pi Labs' technology fund. Balfour Beatty VINCI has created 10 welding apprenticeships with supply-chain partners for HS2’s Curzon approaches in the West Midlands. The initiative targets a UK welding-skills shortage and prioritised local unemployed applicants. National Highways has completed its £317m M25 Junction 10 and A3 upgrade package in Surrey. Balfour Beatty was reported as the contractor delivering the works. Balfour Beatty Kilpatrick is manufacturing high-integrity pipework and ductwork for Sellafield’s Product and Residue Store Retreatment Plant under its long-term PPP frameworks. Its Birkenhead facility has invested in equipment and reports stringent quality-control performance. Balfour Beatty VINCI is progressing HS2 works to extend the Water Orton viaducts and construct the M42 twin-box structure. Its team installed 50 roof beams during the first motorway closure, exceeding the original target by seven beams.

Key messages:

- Balfour Beatty VINCI has created 10 welding apprenticeships with supply-chain partners for HS2’s Curzon approaches in the West Midlands. The initiative targets a UK welding-skills shortage and prioritised local unemployed applicants.
- National Highways has completed its £317m M25 Junction 10 and A3 upgrade package in Surrey. Balfour Beatty was reported as the contractor delivering the works.
- Balfour Beatty Kilpatrick is manufacturing high-integrity pipework and ductwork for Sellafield’s Product and Residue Store Retreatment Plant under its long-term PPP frameworks. Its Birkenhead facility has invested in equipment and reports stringent quality-control performance.
- Balfour Beatty VINCI is progressing HS2 works to extend the Water Orton viaducts and construct the M42 twin-box structure. Its team installed 50 roof beams during the first motorway closure, exceeding the original target by seven beams.
- Balfour Beatty has secured a sole-contractor role on a Leeds Inner Ring Road maintenance and structural-improvement programme worth up to £120m. Major interventions are scheduled to begin in 2027.

Leading themes:

- Major Projects & Delivery: 30.0% of Balfour Beatty's coverage (theme index 1.55, net tone +72)
- Contract Awards & Order Books: 20.0% of Balfour Beatty's coverage (theme index 0.84, net tone +92)
- Leadership, Strategy & M&A: 18.3% of Balfour Beatty's coverage (theme index 2.73, net tone +91)

Notable positive coverage:

- 9 July 2026, news.railbusinessdaily.com: [HS2 welcomes new welding apprentices](https://news.railbusinessdaily.com/hs2-welcomes-new-welding-apprentices/). Balfour Beatty VINCI has created 10 welding apprenticeships with supply-chain partners for HS2’s Curzon approaches in the West Midlands. The initiative targets a UK welding-skills shortage and prioritised local unemployed applicants.
- 28 July 2026, newcivilengineer.com: [M25 upgrades completed after £317M works package which included first ever weekend closures](https://www.newcivilengineer.com/latest/m25-upgrades-completed-after-317m-works-package-which-included-first-ever-weekend-closures-28-07-2026/). National Highways has completed its £317m M25 Junction 10 and A3 upgrade package in Surrey. Balfour Beatty was reported as the contractor delivering the works.
- 27 July 2026, constructionnews.co.uk: [Weld done: How BBK is manufacturing for Sellafield](https://www.constructionnews.co.uk/supply-chain/weld-done-how-bbk-is-manufacturing-for-sellafield-27-07-2026/). Balfour Beatty Kilpatrick is manufacturing high-integrity pipework and ductwork for Sellafield’s Product and Residue Store Retreatment Plant under its long-term PPP frameworks. Its Birkenhead facility has invested in equipment and reports stringent quality-control performance.

Notable negative coverage:

- 20 July 2026, bbc.co.uk: ['Dust from North Hykeham Relief Road work is entering our homes'](https://www.bbc.co.uk/news/articles/crk543r52l2o). Residents near the North Hykeham Relief Road project complained about dust entering their homes. Balfour Beatty is using water suppression and will install a barrier with misting curtains.
- 6 July 2026, constructionnews.co.uk: [Balfour Beatty Scottish prison job faces further delay](https://www.constructionnews.co.uk/buildings/balfour-beatty-scottish-prison-job-faces-further-delay-06-07-2026/). Balfour Beatty's HMP Highland project in Inverness has been delayed again, with opening now expected in spring 2027. The prison's forecast cost has risen to about £209m and it is expected to be around seven years late.
- 3 July 2026, constructionenquirer.com: [HS2 work paused after serious site accident](https://www.constructionenquirer.com/2026/07/03/hs2-work-paused-after-serious-site-accident/). Balfour Beatty Vinci paused HS2 works on its West Midlands section after a worker was struck by a vehicle and airlifted to hospital. Work later resumed following a safety review, while an investigation continued.

- [Balfour Beatty deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=balfourbeatty&view=deep-dive)
- [Balfour Beatty PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/balfourbeatty.pdf)

### Galliford Try

**July coverage centred on Financial Results & Trading**

Galliford Try ranked 4th of 10 by average monthly share of coverage (11.2%) in the UK Construction Contractors benchmark for July 2026, with 50 mentions and a net tone of +88.

Galliford Try secured places on all five regional lots of the £9.5bn Crescent Purchasing Consortium construction framework. The framework covers education, healthcare, civic, new-build and refurbishment work across Great Britain. July 2026: £47.5m Camberley sewage-treatment works contract — New Civil Engineer. Galliford Try secured places on all five regional lots of the £9.5bn Crescent Purchasing Consortium construction framework. The framework covers education, healthcare, civic, new-build and refurbishment work across Great Britain. Galliford Try expects annual profit at the top end of market forecasts after a sixth consecutive year of revenue, profit and cash growth. Its order book rose to £4.3bn and approximately 90% of new-year revenue is secured. A wider AIM market roundup highlights Galliford Try as a small-cap investment idea, citing its strong balance sheet and growing order book. The remainder concerns unrelated listed companies.

Key messages:

- Galliford Try secured places on all five regional lots of the £9.5bn Crescent Purchasing Consortium construction framework. The framework covers education, healthcare, civic, new-build and refurbishment work across Great Britain.
- Galliford Try expects annual profit at the top end of market forecasts after a sixth consecutive year of revenue, profit and cash growth. Its order book rose to £4.3bn and approximately 90% of new-year revenue is secured.
- A wider AIM market roundup highlights Galliford Try as a small-cap investment idea, citing its strong balance sheet and growing order book. The remainder concerns unrelated listed companies.
- Witney Town Council raised resident and business concerns about disruption, access, signage and site presentation during Market Square and High Street works. Galliford Try is the contractor on the project.
- Galliford Try has won a £47.5m Thames Water contract to improve flow capacity, resilience and environmental compliance at Camberley Sewage Treatment Works. The work follows its early contractor involvement on the scheme.

Leading themes:

- Financial Results & Trading: 44.0% of Galliford Try's coverage (theme index 3.43, net tone +100)
- Contract Awards & Order Books: 42.0% of Galliford Try's coverage (theme index 2.01, net tone +95)
- Major Projects & Delivery: 6.0% of Galliford Try's coverage (theme index 0.26, net tone 0)

Notable positive coverage:

- 8 July 2026, proactiveinvestors.com: [Galliford Try wins place on £1.5bn YORbuild framework](https://www.proactiveinvestors.com/companies/news/1095094/galliford-try-wins-place-on-1-5bn-yorbuild-framework-1095094.html). Galliford Try was appointed to the £1.5bn YORbuild Major Works 2 framework for four years. It secured two lots for larger public-sector building projects.
- 21 July 2026, proactiveinvestors.com.au: [Galliford Try lands new contracts in UK's public sector constriction framework](https://www.proactiveinvestors.com.au/companies/news/1095757/galliford-try-lands-new-contracts-in-uk-s-public-sector-constriction-framework-1095757.html). Galliford Try secured places on all five regional lots of the £9.5bn Crescent Purchasing Consortium construction framework. The framework covers education, healthcare, civic, new-build and refurbishment work across Great Britain.
- 18 July 2026, proactiveinvestors.co.uk: [Helium One Global, Galliford Try, Bango, Iofina, London BTC - Small Cap Week in Review](https://www.proactiveinvestors.co.uk/companies/news/1095647/helium-one-global-galliford-try-bango-iofina-london-btc-small-cap-week-in-review-1095647.html). Galliford Try expects full-year profit at the top end of market forecasts. Its order book reached £4.3bn and average monthly cash rose 21%.

Notable negative coverage:

- 25 July 2026, oxfordmail.co.uk: [Town council addresses concerns over Market Square and High Street works](https://www.oxfordmail.co.uk/news/26408714.witney-town-council-speaks-high-street-works/). Witney Town Council raised resident and business concerns about disruption, access, signage and site presentation during Market Square and High Street works. Galliford Try is the contractor on the project.

- [Galliford Try deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=gallifordtry&view=deep-dive)
- [Galliford Try PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/gallifordtry.pdf)

### Laing O'Rourke

**Laing O’Rourke’s visibility swung between disputes, delivery and growth**

Laing O'Rourke ranked 5th of 10 by average monthly share of coverage (8.9%) in the UK Construction Contractors benchmark for July 2026, with 40 mentions and a net tone of +73.

In July 2026, Laing O'Rourke recorded 40 mentions, 8.9% of cohort coverage and rank #5, with net sentiment of +73. Coverage focused on Policy, Procurement & Infrastructure Pipeline. Laing O'Rourke is part of SGE's proposed privately financed 14-reactor UK SMR programme. The consortium aims to select sites and agree support in 2027, targeting first operation in 2034. Laing O'Rourke has signed the main contract for an expansion that will double the size of Calderdale Royal Hospital. The scheme is part of a £196.5m hospital investment programme and will use offsite manufacturing and modern methods of construction. Laing O'Rourke appointed Clare Rodgers as business unit leader of Expanded Geotechnical. She is the first woman to lead one of the contractor's specialist businesses.

Key messages:

- Laing O'Rourke is part of SGE's proposed privately financed 14-reactor UK SMR programme. The consortium aims to select sites and agree support in 2027, targeting first operation in 2034.
- Laing O'Rourke has signed the main contract for an expansion that will double the size of Calderdale Royal Hospital. The scheme is part of a £196.5m hospital investment programme and will use offsite manufacturing and modern methods of construction.
- Laing O'Rourke appointed Clare Rodgers as business unit leader of Expanded Geotechnical. She is the first woman to lead one of the contractor's specialist businesses.
- Laing O'Rourke will expand Explore Manufacturing in Nottinghamshire and relocate Crown House Technologies Manufacturing to a larger Smethwick facility. The plans follow record financial results and support further investment in industrialised construction.
- Laing O'Rourke reported higher profit and a record order book but booked nearly £48m of exceptional items, including a £33m provision for building-safety defects. It warned that Building Safety Act liability could exceed recognised provisions.

Leading themes:

- Policy, Procurement & Infrastructure Pipeline: 25.0% of Laing O'Rourke's coverage (theme index 1.29, net tone +70)
- Contract Awards & Order Books: 20.0% of Laing O'Rourke's coverage (theme index 0.85, net tone +88)
- Leadership, Strategy & M&A: 17.5% of Laing O'Rourke's coverage (theme index 2.37, net tone +71)

Notable positive coverage:

- 2 July 2026, constructionenquirer.com: [Laing O'Rourke joins bid for 14-reactor UK SMR fleet](https://www.constructionenquirer.com/2026/07/02/laing-orourke-joins-bid-for-14-reactor-uk-smr-fleet/). Laing O'Rourke has joined SGE's proposed 14-reactor UK small modular reactor programme under the Advanced Nuclear Framework. It would contribute industrialised construction and advanced-manufacturing expertise to the proposed fleet.
- 2 July 2026, constructionnews.co.uk: [Laing O'Rourke named in consortium for 14-reactor UK SMR programme](https://www.constructionnews.co.uk/contractors/laing-orourke/laing-orourke-named-in-consortium-for-14-reactor-uk-smr-programme-02-07-2026/). Laing O'Rourke is part of SGE's proposed privately financed 14-reactor UK SMR programme. The consortium aims to select sites and agree support in 2027, targeting first operation in 2034.
- 10 July 2026, constructionnews.co.uk: [Laing O'Rourke signs Calderdale hospital expansion deal](https://www.constructionnews.co.uk/contracts/laing-orourke-signs-calderdale-hospital-expansion-deal-10-07-2026/). Laing O'Rourke has signed the main contract for an expansion that will double the size of Calderdale Royal Hospital. The scheme is part of a £196.5m hospital investment programme and will use offsite manufacturing and modern methods of construction.

- [Laing O'Rourke deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=laingorourke&view=deep-dive)
- [Laing O'Rourke PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/laingorourke.pdf)

### Skanska UK

**Skanska’s project-led profile broadened but lost competitive ground**

Skanska UK ranked 6th of 10 by average monthly share of coverage (7.2%) in the UK Construction Contractors benchmark for July 2026, with 32 mentions and a net tone of +28.

July 2026: share rose 1.7 points to 7.2% and rank improved from eighth to sixth; contemporaneous company-focused coverage revisited the A46 cancellation and examined Skanska UK’s balance sheet. Skanska UK's revenue rose 7.5% to more than £1.3bn, supported by major Building division wins and a substantial secured order book. Operating profit fell 14.1%, but the company reported zero debt and stronger long-term cash and profit metrics. The government plans up to £700m of road-funding reductions to support increased defence spending, putting RIS3 schemes at risk. National Highways has cancelled Skanska UK's proposed £297m A46 Newark Bypass contract. Quantum Consult appointed Chris Campbell as a director after his 16-year career with Skanska UK, including senior roles at Cementation. The article reports his move rather than Skanska UK's trading or project performance.

Key messages:

- Skanska UK's revenue rose 7.5% to more than £1.3bn, supported by major Building division wins and a substantial secured order book. Operating profit fell 14.1%, but the company reported zero debt and stronger long-term cash and profit metrics.
- The government plans up to £700m of road-funding reductions to support increased defence spending, putting RIS3 schemes at risk. National Highways has cancelled Skanska UK's proposed £297m A46 Newark Bypass contract.
- Quantum Consult appointed Chris Campbell as a director after his 16-year career with Skanska UK, including senior roles at Cementation. The article reports his move rather than Skanska UK's trading or project performance.
- Policy, Procurement & Infrastructure Pipeline accounted for 16 mentions in this edition.
- Major Projects & Delivery accounted for 6 mentions in this edition.

Leading themes:

- Policy, Procurement & Infrastructure Pipeline: 50.0% of Skanska UK's coverage (theme index 2.84, net tone 0)
- Major Projects & Delivery: 18.8% of Skanska UK's coverage (theme index 0.89, net tone +100)
- Contract Awards & Order Books: 12.5% of Skanska UK's coverage (theme index 0.52, net tone +25)

Notable positive coverage:

- 22 July 2026, constructionwave.co.uk: [The unbroken strength of Skanska UK's balance sheet](https://constructionwave.co.uk/2026/07/22/the-unbroken-strength-of-skanska-uks-balance-sheet/). Skanska UK's revenue rose 7.5% to more than £1.3bn, supported by major Building division wins and a substantial secured order book. Operating profit fell 14.1%, but the company reported zero debt and stronger long-term cash and profit metrics.

Notable negative coverage:

- 2 July 2026, express.co.uk: [The 2 vital UK road projects Keir Starmer just decided to scrap](https://www.express.co.uk/life-style/cars/2224442/new-roads-uk-keir-starmer). The government is consulting on cancelling the A38 Derby Junctions and A46 Newark Bypass schemes as part of road-funding savings. Skanska said its £297m National Highways contract had been cancelled.
- 1 July 2026, highwaysmagazine.co.uk: [A46 bypass casualty of Starmer cuts](https://www.highwaysmagazine.co.uk/companies-and-contracts/a46-bypass-casualty-starmer-cuts). National Highways cancelled Skanska's £297m A46 Newark bypass contract following proposed transport-funding cuts. Skanska said the cancellation would reduce European order bookings in the second quarter of 2026.
- 1 July 2026, constructionnews.co.uk: [DfT braces for £700m infra cuts, including £297m mega road job](https://www.constructionnews.co.uk/government/dft-braces-for-700m-infra-cuts-including-297m-mega-road-job-01-07-2026/). The government plans up to £700m of road-funding reductions to support increased defence spending, putting RIS3 schemes at risk. National Highways has cancelled Skanska UK's proposed £297m A46 Newark Bypass contract.

- [Skanska UK deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=skanskauk&view=deep-dive)
- [Skanska UK PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/skanskauk.pdf)

### Mace

**Mace’s profile combined corporate change with major project wins**

Mace ranked 7th of 10 by average monthly share of coverage (6.9%) in the UK Construction Contractors benchmark for July 2026, with 31 mentions and a net tone of +35.

July 2026: Mace was appointed to deliver the £150m retrofit of London’s former City Hall, reported by Construction Enquirer. Mace is among three firms expected to bid for Meadow Partners' £150m-plus 10-20 Victoria Street redevelopment. Mace is also delivering the nearby 1 Victoria Street office scheme, while Skanska is nearing completion at 105 Victoria Street. Mace was appointed to deliver a £70m refurbishment of 60 Queen Victoria Street in the City of London. Permasteelisa will remove, refurbish and reinstall the building's original façade. Mace is named among contractors behind projects shortlisted for the RIBA Stirling Prize. The award winner will be announced on 15 October. Mace executive chairman Mark Reynolds says UK construction-site productivity has fallen, citing smartphones, red tape and project complexity. Mace Construct executive chairman Mark Reynolds said the contracting business is not for sale and is focused on its future following the Mace Consult separation. He said Mace Construct is expected to adopt a new name.

Key messages:

- Mace is among three firms expected to bid for Meadow Partners' £150m-plus 10-20 Victoria Street redevelopment. Mace is also delivering the nearby 1 Victoria Street office scheme, while Skanska is nearing completion at 105 Victoria Street.
- Mace was appointed to deliver a £70m refurbishment of 60 Queen Victoria Street in the City of London. Permasteelisa will remove, refurbish and reinstall the building's original façade.
- Mace Construct is managing the £150m refurbishment of London’s former City Hall into office and retail space. The work includes cladding, glazing, MEP and public-realm upgrades.
- Mace is named among contractors behind projects shortlisted for the RIBA Stirling Prize. The award winner will be announced on 15 October.
- Mace Construct has been appointed to deliver the £150m retrofit of London's former City Hall. The scheme will expand and re-clad the landmark building for St Martins Property Investments.

Leading themes:

- Major Projects & Delivery: 22.6% of Mace's coverage (theme index 1.09, net tone +71)
- Contract Awards & Order Books: 22.6% of Mace's coverage (theme index 0.97, net tone +43)
- Leadership, Strategy & M&A: 16.1% of Mace's coverage (theme index 2.1, net tone 0)

Notable positive coverage:

- 23 July 2026, building.co.uk: [Three preparing to send in bids for £150m office job on London's ...](https://www.building.co.uk/news/three-preparing-to-send-in-bids-for-150m-office-job-on-londons-victoria-street/5143340.article). Mace is among three firms expected to bid for Meadow Partners' £150m-plus 10-20 Victoria Street redevelopment. Mace is also delivering the nearby 1 Victoria Street office scheme, while Skanska is nearing completion at 105 Victoria Street.
- 22 July 2026, constructionenquirer.com: [Mace taps Permasteelisa for landmark City façade refurb](https://www.constructionenquirer.com/2026/07/22/mace-taps-permasteelisa-for-landmark-city-facade-refurb/). Mace Construct has appointed Permasteelisa for the façade refurbishment of 60 Queen Victoria Street in London. The £70m retrofit includes removal, refurbishment and reinstatement of the original façade.
- 22 July 2026, constructionnews.co.uk: [Mace picks Permasteelisa for 60 Queen Victoria Street facade retrofit](https://www.constructionnews.co.uk/buildings/mace-picks-permasteelisa-for-60-queen-victoria-street-facade-retrofit-22-07-2026/). Mace Construct is delivering a £70m low-carbon cut-and-carve refurbishment at 60 Queen Victoria Street in London. Permasteelisa has been appointed for the façade package.

Notable negative coverage:

- 5 July 2026, telegraph.co.uk: [Brickies on their phones fuel Britain's productivity crisis](https://www.telegraph.co.uk/business/2026/07/05/brickies-on-their-phones-fuel-britains-productivity-crisis/). Mace executive chairman Mark Reynolds says UK construction-site productivity has fallen, citing smartphones, red tape and project complexity.

- [Mace deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=mace&view=deep-dive)
- [Mace PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/mace.pdf)

### Costain

**Costain ranked fourth as water work broadened its media profile**

Costain ranked 8th of 10 by average monthly share of coverage (6.5%) in the UK Construction Contractors benchmark for July 2026, with 29 mentions and a net tone of +52.

July's fall to 6.5% and eighth place coincided with the United Utilities contract extension, but much of that month's policy and procurement material consisted of explicitly contextual mentions involving HS2, the A30 and roads maintenance. July 2026: share fell 3.0 points to 6.5% and rank moved from fourth to eighth; stories included the three-year United Utilities contract extension, while several policy articles were contextual mentions. Yorkshire Water appointed Costain to provide independent design reviews, audits and readiness assessments under its AMP8 technical consultancy and design framework. The relevant technical-assurance lot is valued at £4m. Costain called for industry-wide heatwave protocols and described measures it uses to protect site workers in hot conditions. The article also reports wider calls for clearer workplace temperature rules.

Key messages:

- Yorkshire Water appointed Costain to provide independent design reviews, audits and readiness assessments under its AMP8 technical consultancy and design framework. The relevant technical-assurance lot is valued at £4m.
- Costain called for industry-wide heatwave protocols and described measures it uses to protect site workers in hot conditions. The article also reports wider calls for clearer workplace temperature rules.
- United Utilities extended Costain's managed service provider contract by three years, covering the rest of AMP8. The partnership now runs for 10 years and supports water and wastewater infrastructure investment in north-west England.
- Costain outlines its response to infrastructure skills shortages through early-career recruitment, career development and inclusion programmes. It reports workforce diversity and progression initiatives.
- Costain announced a three-year extension to its United Utilities maintenance contract through the AMP8 regulatory cycle. The extension supports capital maintenance, refurbishment and asset upgrades across the North West.

Leading themes:

- Policy, Procurement & Infrastructure Pipeline: 41.4% of Costain's coverage (theme index 2.25, net tone +8)
- Contract Awards & Order Books: 27.6% of Costain's coverage (theme index 1.2, net tone +100)
- Major Projects & Delivery: 13.8% of Costain's coverage (theme index 0.65, net tone +100)

Notable positive coverage:

- 24 July 2026, newcivilengineer.com: [Yorkshire Water firms for £80M technical consultancy and design framework](https://www.newcivilengineer.com/latest/yorkshire-water-firms-for-80m-technical-consultancy-and-design-framework-24-07-2026/). Yorkshire Water appointed Costain to provide independent design reviews, audits and readiness assessments under its AMP8 technical consultancy and design framework. The relevant technical-assurance lot is valued at £4m.
- 20 July 2026, constructionmanagement.co.uk: [Contractors call for new standards to address heatwaves](https://constructionmanagement.co.uk/contractors-call-for-new-standards-to-address-heatwaves/). Costain called for industry-wide heatwave protocols and described measures it uses to protect site workers in hot conditions. The article also reports wider calls for clearer workplace temperature rules.
- 15 July 2026, newcivilengineer.com: [Costain granted extension to £200M United Utilities contract](https://www.newcivilengineer.com/latest/costain-granted-extension-to-200m-united-utilities-contract-15-07-2026/). Costain received a three-year extension to its United Utilities managed service provider contract, estimated to be worth £200 million. The contract supports delivery of the North West water company's AMP8 capital maintenance programme.

- [Costain deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=costain&view=deep-dive)
- [Costain PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/costain.pdf)

### Wates

**Wates visibility swung between contracts, results and leadership change**

Wates ranked 9th of 10 by average monthly share of coverage (5.6%) in the UK Construction Contractors benchmark for July 2026, with 25 mentions and a net tone of +72.

Wates outlines measures to protect site teams during heatwaves, including risk assessments, rescheduling work, shade and hydration. It says climate adaptation will affect site planning, materials management and building design. Wates outlines measures to protect site teams during heatwaves, including risk assessments, rescheduling work, shade and hydration. It says climate adaptation will affect site planning, materials management and building design. Wates became the Ministry of Justice's largest construction supplier in 2025/26, with £519.8m of departmental revenue including prison-upgrade work following ISG's collapse. Kier, Galliford Try and Laing O'Rourke also recorded increased MoJ payments and prison-project wins. Wates is constructing a 247-place modular prison houseblock at HMP Wayland under the Ministry of Justice’s Accelerated Houseblocks Delivery Programme. The project includes education facilities, a power upgrade and employment support for prison leavers.

Key messages:

- Wates outlines measures to protect site teams during heatwaves, including risk assessments, rescheduling work, shade and hydration. It says climate adaptation will affect site planning, materials management and building design.
- Wates became the Ministry of Justice's largest construction supplier in 2025/26, with £519.8m of departmental revenue including prison-upgrade work following ISG's collapse. Kier, Galliford Try and Laing O'Rourke also recorded increased MoJ payments and prison-project wins.
- Wates is constructing a 247-place modular prison houseblock at HMP Wayland under the Ministry of Justice’s Accelerated Houseblocks Delivery Programme. The project includes education facilities, a power upgrade and employment support for prison leavers.
- Wates Construction London has recruited Kevin Grace from Mace Construct as commercial director as part of its London business reset. The article also notes Wates' increased FY2025 turnover and statutory pre-tax profit.
- Wates Construction’s UK East managing director and commercial director left with immediate effect. The article reports they had been suspended while Wates investigated their conduct.

Leading themes:

- Leadership, Strategy & M&A: 28.0% of Wates's coverage (theme index 3.94, net tone +71)
- Contract Awards & Order Books: 20.0% of Wates's coverage (theme index 0.85, net tone +60)
- Major Projects & Delivery: 20.0% of Wates's coverage (theme index 0.96, net tone +80)

Notable positive coverage:

- 28 July 2026, ft.com: [Lessons from companies learning to beat the heat](https://www.ft.com/content/ff3c8fbe-a0f8-48ae-8dc3-7ef9f49b4cfe). Wates outlines measures to protect site teams during heatwaves, including risk assessments, rescheduling work, shade and hydration. It says climate adaptation will affect site planning, materials management and building design.
- 24 July 2026, constructionnews.co.uk: [Revealed: the MoJ's top construction contractors after ISG's collapse](https://www.constructionnews.co.uk/buildings/revealed-the-mojs-top-construction-contractors-after-isgs-collapse-24-07-2026/). Wates became the Ministry of Justice's largest construction supplier in 2025/26, with £519.8m of departmental revenue including prison-upgrade work following ISG's collapse. Kier, Galliford Try and Laing O'Rourke also recorded increased MoJ payments and prison-project wins.
- 23 July 2026, constructionmanagement.co.uk: [Wates starts on MMC prison block geared to rehabilitation](https://constructionmanagement.co.uk/wates-starts-on-mmc-prison-block-geared-to-rehabilitation/). Wates is constructing a 247-place modular prison houseblock at HMP Wayland under the Ministry of Justice’s Accelerated Houseblocks Delivery Programme. The project includes education facilities, a power upgrade and employment support for prison leavers.

Notable negative coverage:

- 16 July 2026, constructionenquirer.com: [Wates regional MD and director exit suddenly](https://www.constructionenquirer.com/2026/07/16/wates-regional-md-and-commercial-director-exit-suddenly/). Wates Construction’s UK East managing director and commercial director left with immediate effect. The article reports they had been suspended while Wates investigated their conduct.

- [Wates deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=wates&view=deep-dive)
- [Wates PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/wates.pdf)

### Sir Robert McAlpine

**Sir Robert McAlpine’s profile shifted from delivery to strategy**

Sir Robert McAlpine ranked 10th of 10 by average monthly share of coverage (5.1%) in the UK Construction Contractors benchmark for July 2026, with 23 mentions and a net tone of +35.

In July 2026, Sir Robert McAlpine recorded 23 mentions, 5.1% of cohort coverage and rank #10, with net sentiment of +35. Coverage focused on Policy, Procurement & Infrastructure Pipeline. July 2026: sustainability-led design and construction measures at 2 Finsbury Avenue were examined by constructionmanagement.co.uk. Andrew Walker received the 2026 ICE STEM Ambassador of the Year Award. The article notes that he leads Sir Robert McAlpine's STEM Ambassador programme. A Sir Robert McAlpine director argues that improving digital literacy, confidence and workforce capability is essential to construction's digital and AI adoption. The company describes its own training and development initiatives. Integrated Health Projects, a JV between VINCI Building and Sir Robert McAlpine, has been appointed to build the new Leighton Hospital in Crewe. Construction is expected to begin in 2028, with opening planned for 2033.

Key messages:

- Andrew Walker received the 2026 ICE STEM Ambassador of the Year Award. The article notes that he leads Sir Robert McAlpine's STEM Ambassador programme.
- A Sir Robert McAlpine director argues that improving digital literacy, confidence and workforce capability is essential to construction's digital and AI adoption. The company describes its own training and development initiatives.
- Sir Robert McAlpine describes sustainability-led design and construction measures at British Land's 2 Finsbury Avenue project, due for completion in 2027. The contractor reports material reuse, lower-carbon steel, foundation optimisation and programme savings.
- Integrated Health Projects, a JV between VINCI Building and Sir Robert McAlpine, has been appointed to build the new Leighton Hospital in Crewe. Construction is expected to begin in 2028, with opening planned for 2033.
- Sir Robert McAlpine faces a claim of at least £1.2m over alleged fire-safety defects at a London residential development. The contractor says remediation is complete and the building has been deemed safe for occupation.

Leading themes:

- Policy, Procurement & Infrastructure Pipeline: 34.8% of Sir Robert McAlpine's coverage (theme index 1.82, net tone +63)
- Contract Awards & Order Books: 21.7% of Sir Robert McAlpine's coverage (theme index 0.93, net tone −20)
- Other: 13.0% of Sir Robert McAlpine's coverage (theme index 3.95, net tone +67)

Notable positive coverage:

- 30 July 2026, newcivilengineer.com: [Celebrating engineering excellence - winners of the 2026 ICE Awards](https://www.newcivilengineer.com/ice/celebrating-engineering-excellence-winners-of-the-2026-ice-awards-30-07-2026/). Andrew Walker received the 2026 ICE STEM Ambassador of the Year Award. The article notes that he leads Sir Robert McAlpine's STEM Ambassador programme.
- 22 July 2026, constructionwave.co.uk: [Digital construction has moved on. Has the industry?](https://constructionwave.co.uk/2026/07/22/digital-construction-has-moved-on-has-the-industry/). A Sir Robert McAlpine director argues that improving digital literacy, confidence and workforce capability is essential to construction's digital and AI adoption. The company describes its own training and development initiatives.
- 2 July 2026, constructionmanagement.co.uk: [2 Finsbury Avenue: How sustainability reshaped McAlpine's latest City landmark](https://constructionmanagement.co.uk/2-finsbury-avenue-sustainability-sir-robert-mcalpine/). Sir Robert McAlpine describes sustainability-led design and construction measures at British Land's 2 Finsbury Avenue project, due for completion in 2027. The contractor reports material reuse, lower-carbon steel, foundation optimisation and programme savings.

Notable negative coverage:

- 23 July 2026, constructionnews.co.uk: [Sir Robert McAlpine in high-rise fire safety defects claim](https://www.constructionnews.co.uk/legal/sir-robert-mcalpine-in-high-rise-fire-safety-defects-claim-23-07-2026/). Sir Robert McAlpine faces a claim of at least £1.2m over alleged fire-safety defects at a London residential development. The contractor says remediation is complete and the building has been deemed safe for occupation.
- 7 July 2026, constructionenquirer.com: [Blue Sky floors tier one rivals in £176m Barbican revamp race](https://www.constructionenquirer.com/2026/07/07/blue-sky-floors-tier-one-rivals-in-176m-barbican-revamp-race/). Blue Sky Building has been selected to provide construction management for the £176m Barbican Renewal Programme. Sir Robert McAlpine was among the unsuccessful bidders for the role.
- 7 July 2026, constructionmanagement.co.uk: [SME Blue Sky Building to manage modernisation of London's Barbican](https://constructionmanagement.co.uk/sme-blue-sky-building-to-manage-modernisation-of-londons-barbican/). Blue Sky Building has won the construction-management role for the Barbican refurbishment programme through 2030. Sir Robert McAlpine was among the competing contractors not selected.

- [Sir Robert McAlpine deep dive](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07?entity=sirrobertmcalpine&view=deep-dive)
- [Sir Robert McAlpine PDF report](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07/reports/sirrobertmcalpine.pdf)

## Methodology

- **Share of coverage**: an organisation's mentions divided by all mentions of the organisations tracked in the same sector that month, in UK earned media. It is the central measure of media visibility in Omniscan benchmarks. "Average monthly share" is the mean of the monthly shares across the reporting period.
- **Mention**: one article that covers an organisation, classified as positive, neutral or negative in tone. Articles are deduplicated, and an organisation's own websites and passing sponsorship name-checks are excluded, so only earned media counts.
- **Net tone**: positive mentions minus negative mentions, as a percentage of all mentions (range −100 to +100).
- **Themes**: every article is assigned to one of the sector's editorial themes. A theme index above 1 means the organisation is covered on that theme more than its peers are; below 1 means less.
- **Calculation**: every figure is computed directly from the classified articles; narrative summaries are checked against those figures.
- **Sources**: UK national and international, trade and specialist, regional and local, and aggregator and syndication earned media.

## Other UK Construction Contractors editions

- [UK construction contractors media reputation tracker – 2026 year to date](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-ytd.md)
- [UK construction contractors media reputation tracker – H1 2026](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-h1.md)
- [UK construction contractors media reputation tracker – August 2026](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-08.md)
- [UK construction contractors media reputation tracker – September 2026](https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-09.md)
- [All Omniscan media benchmarks](https://www.omniscan.ai/benchmarks.md)

## How to cite

Omniscan, "UK construction contractors media reputation tracker", July 2026 (1 July 2026–31 July 2026), published 1 September 2026. https://www.omniscan.ai/benchmarks/uk-construction-contractors-2026-07
